1. Purpose: To ensure the smooth progress of ship pollutants reception.2. Scope: applicable to the departments and ships involved in the work of receiving pollutants from ships.3. Procedures for recei...
The specific requirements for pollution removal from ships in Yantai are as follows:Specific requirements for oil boom:1. If it is necessary to adjust the type of oil boom or the total height requirem...
Deployment, towing and deployment of Yantai oil boom1. The placement of oil boom. When the oil boom is dropped into the water from the shore or from a ship, a tugboat should cooperate with it or the d...
By carrying out special rectification actions, standardizing the various links of ship pollutant receiving, transshipment and disposal, and realize the monitoring linkage of Yantai pollutant receiving...
Article 1 In order to effectively implement the management system of the Yantai Ship Pollution Removal Agreement and standardize the management of ship pollution removal units, in accordance with the ...
1. PurposeIn order to strengthen the safety management of electrical operations during the construction of ships and offshore engineering (hereinafter collectively referred to as ships) and avoid acci...
(1) Oily ballast waterAfter the oil tanker has unloaded its oil, in order to ensure safe navigation and improve the efficiency of the propeller, a certain amount of water must be installed in the carg...
According to the requirements of the International Convention for the Prevention of Pollution from Ships, the necessary capacity of the slop tank of an oil tanker should not be less than 3% of the shi...
Follow us